CNC Gateway Benutzerhandbuch: Schnittstelle zwischen EG8200 Mini-CNC Gateway und Siemens CNC

In this tutorial, we will focus on explaining how the EG8200 Mini-CNC Gateway interfaces with Siemens CNC systems. We hope this proves helpful to you.

Starting today, we embark on a new journey. IOTRouter will launch a series of tutorials on how EG series gateways interface with CNC equipment. This tutorial series will feature case studies on well-known CNC brands such as Siemens, Mitsubishi, and many others.

1. EG8200 Mini-CNC Gateway

Die EG8200Mini-CNC is an CNC Data Acquisition Gateway designed for CNC equipment with powerful data acquisition and remote monitoring capabilities. The equipment supports a variety of industrial protocols, such as Modbus, MQTT, etc., and can be compatible with multi-brand CNC equipment to help users achieve remote CNC machine tool management.

2. Siemens CNC

Siemens CNC is a series of numerical control systems developed by Siemens. Through CNC systems, machine tools can precisely execute operations such as cutting, drilling, milling, and turning according to pre-programmed instructions (G-code/ISO code).

Siemens CNC systems are widely used in automotive, aerospace, mechanical manufacturing, mold processing, and other industries, offering high precision, high efficiency, and high reliability.

3. How to Interface the EG8200Mini-CNC gateway with Siemens CNC

Compatible CNC: SINUMERIK 802/810/828/840

1. Hardware-Anschluss

The Siemens CNC protocol utilizes Ethernet communication. Therefore, only ensure the gateway’s LAN port IP and the CNC’s IP are within the same subnet (Note: In special cases, they may be on different subnets, requiring routing configuration—consult technical support for details). IP addresses are assigned as follows in this example:

EG8200Mini-CNC-Gateway

Siemens CNC

IP-Adresse 10.227.150.30 10.227.150.95

Hardware-Verbindung

2. CNC-Kommunikationsparameter

Vom CNC-Techniker bereitgestellt.

The CNC network port parameters are:

IP: 10.227.150.95,  Hafen: 102

3. Gateway-Einstellungen

3.1. CNC-Verbindungseinstellungen

Drag a Siemens node from the CNC panel on the left. Double-click to open the settings page and configure as follows based on the PLC parameters:

Adresse: 10.227.150.95

Hafen: 102

Zeitüberschreitung der Verbindung: 5000

Heartbeat Interval: 60000

Data Timeout: 2000

Data Interval: 1000 (Read Cycle)

Loop Wait: 1000 (Data Point Read Interval)

Data Point Settings

3.2. Data Point Settings

Check the required data:

Data Point Settings

3.3. Prüfung

Klicken Sie auf Deploy und beobachten Sie, wie alle paar Sekunden ein Datenpunkt gedruckt wird. Überprüfen Sie die empfangenen Datenpunkte, um die erfolgreiche Kommunikation zu bestätigen!

Die Referenztabelle der Datenpunkte finden Sie unter:

Dies ist eine Inhaltskarte von Yueque. Klicken Sie auf den Link, um sie anzusehen: https://iotrouter.yuque.com/zn3vdn/eg8000/xr6s46z90pevgwag

Testing1 1 Testing2 EG8200 Mini-CNC Gateway with Siemens CNC-test

 

 

 

About Me
db6893fd1d3e314ac461fa240068dc06?s=150&d=mp&r=g
IoT Solutions Specialist ~ Web ~  More Posts

Agnes Wang is an IoT Solutions Specialist at IOTRouter, focusing on industrial IoT gateways, edge computing, and industrial automation solutions.

She specializes in industrial communication technologies, including Modbus, IEC 60870-5-104, MQTT, OPC UA, PLC integration, and remote monitoring applications. She contributes to technical articles and application guides covering industrial IoT solutions, protocol conversion, and edge computing.